SZNS NRS 097-2-3:2014 GRID INTERCONNECTION OF EMBEDDED GENERATION

E709.38

This section of SZNSNRS 097 is intended to guide Eswatini distributors in terms of simple rules to be applied when applications for LV connected embedded generators are being assessed. The proposed criteria indicate the conditions under which LV connected generators can be connected to the utility grid without having to perform detailed network studies. Applications that do not meet these criteria will need to follow an alternative process, which might require detailed network studies.

Clear

Description

This section of SZNSNRS 097 is intended to guide Eswatini distributors in terms of simple rules to be applied when applications for LV connected embedded generators are being assessed. The proposed criteria indicate the conditions under which LV connected generators can be connected to the utility grid without having to perform detailed network studies. Applications that do not meet these criteria will need to follow an alternative process, which might require detailed network studies.

TABLE OF CONTENTS

Content Page
1 Scope 1
2 Definitions 1
3 Essential ingredients 2
4 Optional ingredients 2
5 Improvers 2
6 Bacterial inhibitors 3
7 General requirements 3
8 Hygiene 4
9 Packaging 5
10 Labeling 5
Annex A 7
Annex B 8
Annex C 9
Annex D 10
Annex E 11
Annex F 13
Annex G 14
Annex H 15
Annex I 20

Additional information

Format

PDF, Hardcopy